News Structural Protection Systems
Head made of stainless steel: expansion joints with hybrid profile
July/07
Maurer Söhne develops corrosion resistant clamping of sealing elements
A Show Case of Structural Protection
Dec/06
A cable stayed bridge in Dubrovnik serves as show case for
the damping and control of bridge movements.
the damping and control of bridge movements.
CE-Mark for MAURER MSM® Spherical Bearings
Juni/06
A unique sliding material that displays strengths at high and low temperatures, high accumulated sliding displacements, high displacement velocities, and high contact pressures.
MAURER damps the world’s longest stay cables
Mai/06
Sutong Bridge, China – the longest cable stayed bridge in the world, will be equipped
with semiactive and adaptive magnetorheological cable dampers.
Tuned Mass Dampers for the Olympic Symbol of Torino
Jan/06
By means of innovative magneto-rheological tuned mass dampers, the footbridge Ponte MOI is „calmed down“.
Seismic Protection for Buildings: Onassis-House and Akropolis-Museum
July/05
Innovative Sliding Isolation Pendulum Bearings pass seismic tests